Friendship Machinery Co., Ltd

Friendship Machinery Co., Ltd Welding & Cutting, Quality Is Our Pursuit Of The Eternal Theme !

Manufacturer from China
Active Member
11 Years
Home / Products / Wind Tower Production Line /

Hanging Scaffold Wind Tower Production Line , Aluminum Steel Suspended Working Platform

Contact Now
Friendship Machinery Co., Ltd
City:wuxi
Province/State:jiangsu
Country/Region:china
Contact Person:MrIA LU
Contact Now

Hanging Scaffold Wind Tower Production Line , Aluminum Steel Suspended Working Platform

Ask Latest Price
Video Channel
Brand Name :Friendship Machinery
Model Number :ZLP Series
Certification :CE, ISO
Place of Origin :China
MOQ :1
Delivery Time :30 working days
Packaging Details :Standard export packing
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Hanging Scaffold Wind Tower Production Line , Aluminum Steel Suspended Working Platform


It is designed particularly for heavy applications on facades, chimneys, silos, bridges etc.


The complete system consists of the working platform equipped with two electric LTD hoists and the support wheels, suspended by means of steel wire ropes from a suspension structure.

Hanging Scaffold Wind Tower Production Line , Aluminum Steel Suspended Working Platform

1. Safety systems


To ensure safe operation without danger to personnel, the platform is fitted with the following safety devices:
- Service brake incorporated in the LTD hoist.
- Two fall arrest devices (Anti-tilt LSF safety lock) acting on the safety wire ropes.
- Overload sensor incorporated in the LTD hoists according to EN 1808. (Option)
- Two upper limit switches.
- No power descent in case of power failure.
- Emergency stop.
- Phase controller. (Option)

2. The main para. Of ZLP1000 suspended platform


- Rated Load: 1000kg
- Lifting Speed: 8.7m/min
- Voltage-3Phase: 380V/ (415V/220V)
- Frequency: 50Hz/60Hz
- Power: 1.8kw×2
- Hoist: LTD100
- Safety Lock: LSF310
- Dia. of Wire Rope: 4×31SW+FC-10.2mm
- Platform Size: (2.5×3)×0.76×1.45m
- Weight of Suspension Jibs: 340kg
- Weight of Lifting Part: Aluminum340kg/Steel 520kg
- Counter Weight: 1200kg
- 20’ GPQty of Package: 8
- Technical Information

Hanging Scaffold Wind Tower Production Line , Aluminum Steel Suspended Working Platform

Inquiry Cart 0