Friendship Machinery Co., Ltd

Friendship Machinery Co., Ltd Welding & Cutting, Quality Is Our Pursuit Of The Eternal Theme !

Manufacturer from China
Active Member
11 Years
Home / Products / Shot Blasting Machine /

22m Drive Through Bus Spray Painting Cabin Double Construction with Insulations

Contact Now
Friendship Machinery Co., Ltd
City:wuxi
Province/State:jiangsu
Country/Region:china
Contact Person:MrIA LU
Contact Now

22m Drive Through Bus Spray Painting Cabin Double Construction with Insulations

Ask Latest Price
Video Channel
Brand Name :Friendship Machinery
Model Number :FSM Series
Certification :CE, ISO
Place of Origin :China
MOQ :1
Supply Ability :20 sets per month
Delivery Time :25 working days
Packaging Details :standard packing
Contact Now

Add to Cart

Find Similar Videos
View Product Description

22m Drive Through Bus Spray Painting Cabin Double Construction with Insulations

Booth Dimensions

- Internal Size(LxBxH)

15000x5000x5000mm

- External Size(LxBxH)

15150x7700x5900 mm

Foundation and Floor

- Loading Capacity of Galvanized

Grating

NO

- Surface Area

33M² ( 2 rows air exhust plenum chamber)

- Metal Basement

NO

- Drive-in Ramps

NO

Wall and Door

- Steel Wall and Roof Panel

Double Construction with Insulations EPS 50mm

- Thickness

Double Construction with Insulations EPS 50mm

- Folded Entrance Door With

Safety Glass Window

3200x2700 mm(BxH)

- Operator’s Door With Safety, Glass Window

800x2000 mm(BxH)

Lighting

- Ceiling Lightings

8 Units, each 4x36 W, Total 1152W

- Side Lightings

8 Units, each 2x36 W, Total 576W

- Brightness

>1000 Lux, IP54 Grade

Filtration

- Prefilters

Fiberglass,Paint-Stop-Filters Plate type duel filters

- Ceiling Filters

EU5 Fine Filters, 6 Units

- Floor Filters

Fiberglass, Paint-Stop-Filters

Ventilation System

- Direct Drive Motor (Fresh Air)

2x7.5KW,970RPM,380V,50HZ motor certification:CE

- Direct Drive Motor (Exhaust Air)

2x7.5KW,970RPM,380V,50HZ Domestic motor certification:CE

- Fan Capacity

50.000m³/h

- Air Flow Speed

+/- 0.20 m/sin an empty booth

Heating System

- Heating Exchanger

Stainless Steel 1Gr18Ni9Ti

- Heating Exchange Capacity

2x232KW(260.000kcal/H)RIELLO

- Max. Drying Temperature

80 ℃

- Heating time

10-15 min (from 20 to 60℃) by Drying Phase

- Heating Type (on option)

Diesel / Gas Burner

Control Board

- Control system

Stander control Delta Depressurization start system

- Function

Spraying ,baking, warming spray paint, emergency stop switch

- PLC

Yes

- Inverter control

On option

- Import element

master device import element

- Overpressure Manometer

Yes

- Alarm equipment

Yes

22m Drive Through Bus Spray Painting Cabin Double Construction with Insulations

Inquiry Cart 0